In 2014 Bossie Construction helped construct 7 urgent care facilities in New England. We performed turn key operations and worked directly with the GC, owner, and owners vendors. Our tasks included demo of existing facility, saw cut slab for new plumbing, pour back slab, frame walls, install blocking for cabinets and accessories, install sheetrock, install cabinets, ceilings, doors, hardware, and medical accessories.
2014 Urgent Care Facility build outs
This entry was posted in Medical and tagged central virginia, construction, general contractor, medical buidings. Bookmark the permalink.