2014 Urgent Care Facility build outs

Lebanon NH

Lebanon New Hampshire Clearchoice Urgent Care

We install blocking for every cabinet and accessory to give the client a product that will perform for years to come.

We install blocking for every cabinet and accessory to give the client a product that will perform for years to come.

Erdman designers worked with the client to create a color sceme that worked with their logo.

Erdman designers worked with the client to create a color sceme that worked with their logo.

Facilities were delivered with art work hung and floors waxed.

Facilities were delivered with art work hung and floors waxed.

Cabinetry and medical accessory install

Cabinetry and medical accessory install

A wood frame building which we had to bring up to code. We fire rated the ceiling and added a new subfloor

A wood frame building which we had to bring up to code. We fire rated the ceiling and added a new subfloor

Framed out interior walls and installed foam insulation for a moisture and mold free wall cavity.

Framed out interior walls and installed foam insulation for a moisture and mold free wall cavity.

20140910_190727

Scarborough ME framing for Urgent care facility

In 2014 Bossie Construction helped construct 7 urgent care facilities in New England. We performed turn key operations and worked directly with the GC, owner, and owners vendors. Our tasks included demo of existing facility, saw cut slab for new plumbing, pour back slab, frame walls, install blocking for cabinets and accessories, install sheetrock, install cabinets, ceilings, doors, hardware, and medical accessories.

Posted in Medical | Tagged , , , | Leave a comment

2011 Dormer Addition

New dormer

Stairway

Hallway

Bedroom 1

Bedroom 1

dormer addition

Posted in Renovations, Residential | Leave a comment

Calvert Hospital Endoscopy suite

 

installed all casework, wall protection, curtains, and accessories

installed casework, wall protection 4' and down, all while client was still occupying space

installed wall protection, doors and hardware, case work , and accessories

Calvert Hospital Endoscopy suite Remodel:    Bossie construction worked closely with the client and General contractor on this project to ensure day to day operations were not affected.

Posted in Medical | Leave a comment

Barboursville Vineyards

Two year renovation project encompassing several outbuildings, a barrel room, country room/event space, museum room, drying barn, and restoration work on the 1804 Inn.


Posted in Commercial | Leave a comment

Prince Frederick Neurology Suite

Case work installation in neurology suite, Calvert Medical Arts Building, Prince Frederick, Maryland.

Posted in Medical | Leave a comment

Petersburg Children’s Rehabilitation Center

Built steel curved wall panels and installed metal panel facade.

Posted in Medical | Leave a comment

Dental Office Renovation, Palmyra, VA

Before

Before

Before

After

After

After

After, Custom Floor Design

After

Bossie Construction just finished a dentist office renovation in Palmyra, VA for a client who needed us to totally redesign an existing dental office. We were able to come up with a very usable and affordable turn-key project. 100 % of our work is repeat customers or referrals, showing our dedication to meeting our customer’s needs.

Posted in Before and After Photos, Medical, Renovations | Leave a comment

Malden Farm, Louisa, VA

Posted in Residential | Leave a comment

Calvert Medical, Maryland

Posted in Medical | Leave a comment

Covered Bridge in Connecticut

Posted in Commercial | Leave a comment

LOW Equestrian Center Renovation, Before and After

Lake of the Woods Equestrian Center, Virginia

http://www.lowa.org/equestrian.htm

Posted in Agricultural, Before and After Photos, Renovations | Leave a comment